Live-site refurbishment of the boiler house into a CHP-led energy centre and district heat network, connecting 6 buildings via ~1 km buried and ~1 km above-ground mains,  with school operations maintained.

We delivered Phase 1 of the school’s plan to serve all buildings (and future development) via a central network: a complete boiler-house refurbishment to a CHP-led energy centre plus a new district energy network. Works were sequenced to keep the school fully operational throughout.

Phase 1 connected six buildings using approximately 1 km of buried and 1 km of above-ground heat mains through the campus, providing a scalable platform for later phases.

  • Technologies: CHP-led energy centre; district heat network
  • Scope: Boiler-house refurbishment, ~1 km buried + ~1 km above-ground heat mains, live-site sequencing
  • Outcome: Operations maintained, centralised heat, phased expansion path for all buildings
Scroll to Top