Temporary boilers bridge the gap while a new energy centre is delivered from Lisson Green, maintaining service until permanent plant is commissioned.

We installed and operated interim LTHW plant to provide continuity of heating and hot water until the incoming energy centre was ready. Works included tie-ins, metering, controls integration and handover planning for a seamless cut-over.

  • Technologies: Temporary boiler plant, PHEs, metering, BMS integration, remote monitoring
  • Scope: Survey/design; tie-ins; acoustic management; fuel/power; operational monitoring; changeover support
  • Outcome: Reliable interim heat; smooth transition to the new energy centre; risk reduced
Scroll to Top